KRYOTEC ENGINE
87
49. Open the retaining clip (1) and disconnect the
Powertrain Control Module (PCM) wire harness
connector.
50. Disconnect the engine wire harness connector
(2) and disengage the wiring from the spring
retainer.
51. Disconnect the fuel tank return line quick
coupling (1).
52. Disconnect the fuel supply line quick coupling
(2).
53. Remove the screw (3) and reposition the fuel
lines retaining bracket.
54. Connect a hydraulic crane and 1871001700
Sling (1) to the lifting brackets.
55. Remove the bolts (1a) and (1b) and remove the
right engine mount isolator.
56. Remove the bolt (1) and the support bracket.
57. Remove the bolts (2a) and (2b) and remove the
left engine mount isolator.
58. Remove the power train from the engine
compartment and place it on a suitable platform.




