GEAR BOX 6450
43
44. Slide the lock plate on main shaft.
NOTE:
Ensure gap between the lock plate and the 6
th
gear of counter shaft should be 2 mm to 2.5 mm.
45. Slide the reverse synchro ring, double cone
synchro pack and reverse gear assembly
along with shifter fork assembly together on
main shaft.
46. Slide the Wheel speedo meter sensing and
inner race on main shaft.
NOTE:
Inner race of main shaft cylindrical roller bearing is
to be fitted after fitment of speedo sensing wheel.
47. FOR 4X4 inner race of main shaft cylindrical
roller bearing will be fitted after reverse gear
assembly.
48. Remove the lock nuts.




