ZEST AND BOLT - page 244

ENGINE 1.3 QUADRAJET (75PS)
19
INSTALLATION OF ENGINE ON TO THE
VEHICLE
NOTE
Before starting the installation process, check the
mounts for any wear or damage, if found replace
the mounts
1. Follow the reverse order of the removal
process to install the engine.
2.
Tighten the mounts to the specified torque
specified below.
MOUNT
BOLT / NUT
QTY
TORQUE
(Kg-m)
A Mount
M12 BOLT
3
7.8
B Mount
AM 12 NYLOC
NUT
1
10.8
C Mount
M12 BOLT
1
7.8
3. Connect all the electrical connectors, hoses,
fuel lines etc.
4. Refit all the components referring the removal
procedure.
5. Refill the lubricants, coolant; Brake fluid and
Power Steering Oil.
NOTE
It is always a good practice to trace all individual
circuits like, Cooling, Intercooler, Air intake, etc.
before starting the engine.
1...,234,235,236,237,238,239,240,241,242,243 245,246,247,248,249,250,251,252,253,254,...
Powered by FlippingBook