1.5L REVOTORQ ENGINE

53

METHOD 2

1. Vehicle condition And Parking.

Park the vehicle on flat level surface.

Allow the vehicle to cool down to workable

temperature

(preferably

to

ambient

temperature).

Place ta clean tray just below the drain plug

located at bottom of radiator.

2. Drain coolant from radiator.

Open the pressure cap & drain plug and

allow the coolant to drain out into the

container.

Blow in the pressurized air through pressure

cap opening till all the coolant is drain out &

close pressure cap.

3. Remove coolant from water pump, heater and

cooling system hoses.

Open the heater top hose & blow

pressurized air in the heater top hose

thermostat side (block the heater inlet part

towards heater coil with the help of plug).

Repeat same operation in reverse direction

(heater inlet towards heater coil side air will

be blown & thermostat side will be closed).

Connect the heater top hose. Close the

drain plug.

4. Initial coolant filling through pressure cap

opening.

Opening EGR hose and top hose of heater

core.

Filling coolant through pressure cap

opening till coolant is visible in the EGR

hose. Refit EGR hose.

Keep filling coolant till coolant is visible in

the heater hose. Refit the heater hose.

Fill the no loss tank till the max level.

5. Start the engine and maintain engine 3000

rpm.

Close the pressure cap & start the engine in

idle condition for a few seconds. Rev up &

maintain engine speed at 3000±100 rpm.

Radiator fan switch ‘ON’ for the first time

once coolant temperature reaches the fan

trigger threshold.

Continue the de-aeration process until

completion of two heat cool cycles of

radiator fan (i.e. Radiator fan turns ‘ON’ &

‘OFF’ for two times).

Allow engine to cool down until coolant

temperature reaches ambient temperature.

6. Fill coolant after vehicle cool down.

After cool down, observe drop in coolant

level in no loss tank & if required fill coolant

until max mark.

Also open pressure cap & fill coolant till the

neck is full if required.

De-aeration process is now complete.