Background Image
Table of Contents Table of Contents
Previous Page  255 / 1006 Next Page
Information
Show Menu
Previous Page 255 / 1006 Next Page
Page Background

1.5L REVOTORQ ENGINE

51

iii. COOLANT FILLING (DE – AREATION

PROCEDURE)

METHOD 1

Using Radiator Check and Fill system Kit.

NOTE

Prior to start the process, drain and flush

coolant system.

Kit Radiator check & Fill System (8855 WORK

0087)

1. Take the specified premixed coolant in a

clean container preferable having measuring

scale, approximately 10% more than the

specified coolant capacity of the vehicle (e.g.

if the coolant capacity is 6 ltr then take 6.6 ltr).

2. Connect pneumatic line using commercially

available suitable QRC. Install the cone

adapter from the kit to the vacuum gun and.

Put the coolant filler hose into the coolant

container; ensure that the filler hose will

always be submerged.

3. Insert the cone adapter with vacuum gun into

the radiator filler neck (no loss tank) or

coolant aux tank; make sure the refill hose

valve is closed.