1.5L REVOTORQ BS VI ENGINE
104
7. Disconnect electrical connection to the
temperature sensors.
8. Remove the mounting fasteners and take
down the LNT+DPF assembly.
FITMENT
For fitment follow removal procedure in reverse.
NOTE
Flushing operation for cleaning the catalytic
converter should be done by directing dry
compressed air draft in the direction of
catalytic converter inlet, after removing it from
the vehicle.
Ensure
flex bellow should not be pre stress or
bend as shown in below figure & also ensure
proper orientation of rubber hangers




