Background Image
Table of Contents Table of Contents
Previous Page  158 / 1003 Next Page
Information
Show Menu
Previous Page 158 / 1003 Next Page
Page Background

1.2L REVOTRON ENGINE

147

12. Install the spark plugs to the specified torque.

13. Install ignition coil on the head cover

14. Install both the solenoid valve of VCT.

VII. Assembly of Sensors

1. Install knock sensor on to the engine block.

2. Install oil pressure switch sensor on the engine

block.

3. Install crank angle/rpm sensor on the engine

block.