Background Image
Table of Contents Table of Contents
Previous Page  269 / 1232 Next Page
Information
Show Menu
Previous Page 269 / 1232 Next Page
Page Background

ENGINE 1.3 QUADRAJET (75PS)

44

47.Position the crankcase sump (1a) in its housing

and secure it tightening the M6 bolt s (1b) to a

torque of 0.8 ~ 1.0 Kg-m and the M6 nuts (1c) to

a torque of 0.8 ~ 1.0 Kg-m.

NOTE :

Follow the order shown in the figure for each tightening

sequence. The tightening to 0.8 - 1.0 Kg-m is

performed in two stages: pre tightening to 0.4 Kg-m

followed by an additional tightening of 0.8 - 1.0 Kg-m.

48.Place the bracket (2a) in its housing and secure it

by tightening the M8 bolts (2b) to a torque of 2.7 ~

3.3 Kg-m.

49.Rotate the engine through 180° on the overhaul

stand.

50.Place the engine oil dip stick pipe back in it s

housing and fasten it with the bolt.

51.Close the oil vapour pipe retaining clip.

52.Place the intermediate driveshaft mount in position

and secure it tightening the M8 bolts to a torque

of 2.0 ~ 2.4 Kg-m.

53.Remove the

tool

287158900651 (Hose).

54.Place the timing side rigid engine support in its

housing with the engine lift bracket and secure it

tightening the M10 bolts to a torque of 5.7 ~ 6.3

Kg-m .

55.Place the water pump, complete with gasket in

position, and then tighten the M10 bolts to a 0.8 ~

1.0 Kg-m torque.

56.Position the engine components single belt moving

tensioner in its housing and secure it tightening

the M10 bolt to a torque of 4.5 ~ 5.5 Kg-m .

57.Position the auxiliary drive belt fixed tensioner in

its housing and secure it tightening the M8 bolt to

a torque of 2.2 ~ 2.7 Kg-m .

58.Adjust the mobile tensioner with a wrench and fit

the auxiliary drive belt.

59.Place the turbocharger unit complete with catalytic

converter back in it s housing and secure it by

tightening the M8 nuts to a torque of 2.2 ~ 2.7 Kg-

m .

60.Refit the exhaust manifold heat shield with the

engine lift bracket and secure with the nut and

bolts.

61.Position the pipe carrying engine oil to the

turbocharger in its housing and secure it tightening

M10 connectors to a torque of 1.3 ~ 1.6 Kg-m.

NOTE :

Follow the order shown in the figure for each tightening

sequence. The tightening to 0.8 - 1.0 Kg-m is

performed in two stages: pre tightening to 0.4 Kg-m

followed by an additional tightening of 0.8 - 1.0 Kg-m

62.

Position a new gasket between the crankcase and

the engine oil return pipe to the turbocharger.

63.Position a new gasket between the crankcase and

the engine oil return pipe to the turbocharger.

64.Fit the protective strip s to the oil filter and the

engine oil heat exchanger.

65.Place the electrical wiring in position and fasten it

to the bands on the air capacity chamber.

66.Connect the electrical connection to the E.G .R.

solenoid valve.

67.Connect the electrical connection to the fuel

pressure regulator.

68.Secure the electrical connection for the pressure

relief sensor.

69.Connect the electrical connection to the fuel

pressure sensor.

70.Refit the electrical wiring in its seat and secure.

71.Tighten the bolts securing the wiring duct to the

cylinder head.

72.Connect the electrical connection for the air

conditioning compressor engagement solenoid

valve.

73.Connect the electrical connection to the timing

sensor.

74.Secure the electrical connections to the injectors.

75.Secure the electrical connections to the heater

plugs.

76.Connect the electrical connection to the engine

oil pressure warning light switch.

77.Connect the electrical connection for the engine

rpm sensor.

78.Secure the electrical connection to the engine

coolant temperature sensor.

79.Remove the engine from the overhaul stand.