Background Image
Table of Contents Table of Contents
Previous Page  165 / 1232 Next Page
Information
Show Menu
Previous Page 165 / 1232 Next Page
Page Background

Revotron 1.2T

118

5. Sequence for Bolt Tightening.

a) Tighten to 3kgm in the sequence as

marked.

b) Tighten to 5kgm in the same sequence as

marked.

c) Tighten to 6.5kgm in the same sequence

as marked.

6. Using special tool, fit the spark plug to the

cylinder head.

7. Fit the Vacuum Pump along with the Gasket.

8. Lubricate the crankshaft and fit oil pump

assembly along with the gasket.

9. Fit rear timing cover and torque the bolts to

specified torque.

10. Fit the water pump assembly along with the

gasket to the engine block and torque the

bolts to specified torque.