Background Image
Table of Contents Table of Contents
Previous Page  568 / 1595 Next Page
Information
Show Menu
Previous Page 568 / 1595 Next Page
Page Background

AMT KIT

26

G. POWER UNIT (PWU) BASE PLATE

REMOVAL AND RE-FITMENT ON BENCH: -

Removal:

Disconnect all the connectors of the system

wiring harness (DC Motor, Cultch Position

Sensor and Transmission Control Unit) and

threaded hole

body.

unit

(MGA) first (refer the procedure. Mechatronic

Gear Actuator Unit (MGA) Removal and Re-

Fitment on Bench).

Installation:

fixture.

In order to

avoid O-rings damages, screw three rods

Assemble the O-rings on the connectors.

Mount the connectors with O-rings in their

lu

seats.

Remove traces of oil from the

Gea

with

gasket with care to avoid contamination from

foreign materials (dust, metal burrs, etc.) or

surface damages.

Assemble the

inserting the centering pins into the fixing

body.

gaske

the threaded rods for reference and moving it

parallel towards the mating surface.

seats came in contact with O-rings, push it

slowly, with appropriate load to complete the

assembly.

Unscrew the rods and screw the three screws

the right torque 10

± 1 Nm.

Connect the connectors of the wiring harness

Insert the plastic clip into its threaded hole on

the connector of wiring harness on the DC

Motor.

Fi

hydraulic circuit) and restore it after the purge

procedure.