Background Image
Table of Contents Table of Contents
Previous Page  384 / 1428 Next Page
Information
Show Menu
Previous Page 384 / 1428 Next Page
Page Background

378

DRIVETRAIN

6. Assemble the spring, carrier and ball, along with

the engaging gear into the Shifter Sleeve (1

st

and

2

nd

gear).

7. Place the Shifter sleeve along the engaging gear

assembly on the shaft, on the synchro cone.

Groove is towards First gear side.

8. Place the synchro cone on the second gear and

measure the gap between the second gear and

the synchro cone using a feeler gauge. This gap

should be within 1.15 ~1.40 mm

9. Place the synchro cone first on the shifter sleeve,

with projected side facing downwards and then

place the second gear on it.