ENGINE 1.3 QUADRAJET (75PS)
31
25.Loosen the collar (1) securing the exhaust gas/
coolant heat exchanger for the EGR system, air
chamber side.
26.Remove the bolt s (2a) and remove the water/
exhaust gas heat exchanger for the E.G.R. system
(2b).
27.Release the engine oil vapour recirculation pipe (1)
for the retaining collars on the air capacity chamber.
28.Unscrewbolts (2a) and remove the engine oil vapour
separator (2b) complete with engine oil vapour
recirculation pipe (2c).
29.Remove the bolts (1a) and remove the air chamber
(1b) complete with pressure relief sensor.
30.Remove the gasket (2).