Background Image
Table of Contents Table of Contents
Previous Page  379 / 1003 Next Page
Information
Show Menu
Previous Page 379 / 1003 Next Page
Page Background

1.5L REVOTORQ BS VI ENGINE

175

7. Install the high pressure fuel lines on all the

fuel injectors.

8. Place the gasket on the intake ports of the

cylinder head. Make sure to use new gasket

when installing.

9. Install the intake manifold assembly. Use

specified torque and tightening sequence.

10.Install air intake elbow along with air

temperature sensor.

11.Install the H.P. fuel line connected to the fuel

rail.

12.Place the gasket on the EGR ports of the

cylinder head. Make sure to use new gasket

when installing.