Q5 Project –EMS ECU/Component Replacement
Procedure
Q5 Project – EMS ECU/ Component Replacement Procedure
Doc No: 2921 02 224 A1730
Date: 24 July 2017
Revision: 0.1
Page 11 of 26
Prepared: Shashank Addala / Prasad
M
Checked: Prasad M
Approved: Satishkumar P
This document contains confidential information which is exclusive property of TML. The contents of this
document shall not be reproduced, or conveyed, or given to third parties in any manner without the consent
of TML.
Step 4: Below Routine to be executed
“DPF 1 - Replacement of ECU and Old ECU is not communicating (Set EEPROM values for PFlt_CoRgn
Exchange of ECU) ($ 02 06)”
Routine Execution Detail:
Refer Section 4.3.1 in ‘TML_PT_Q5_Routine Procedures_EMS Requirement_2921 02 224
A1724_5June2017_V0.2’ document
Step 5: Below Routine to be executed
“TVA DC Motor Test”
Routine Execution Detail:
Refer Section 4.11 in ‘TML_PT_Q5_Routine Procedures_EMS Requirement_2921 02 224
A1724_5June2017_V0.2’ document
Step 6: Below Routine to be executed
“EGR high pressure DC Motor Test”
Routine Execution Detail:
Refer Section 4.7 in ‘TML_PT_Q5_Routine Procedures_EMS Requirement_2921 02 224
A1724_5June2017_V0.2’ document
Step 7: Below Routine to be executed
“DPF Service Regeneration”
Routine Execution Detail:
Refer Section 4.3.2.2 in ‘TML_PT_Q5_Routine Procedures_EMS Requirement_2921 02 224
A1724_5June2017_V0.2’ document
Step 8: Below Routine to be executed
“VGT DC Motor Test”
Routine Execution Detail:
Refer Section 4.12 in ‘TML_PT_Q5_Routine Procedures_EMS Requirement_2921 02 224
A1724_5June2017_V0.2’ document
Step 9: Below Routine to be executed
“VGT DC Motor Test”
Routine Execution Detail:
Refer Section 4.12 in ‘TML_PT_Q5_Routine Procedures_EMS Requirement_2921 02 224
A1724_5June2017_V0.2’ document