Q5 Project –EMS ECU/Component Replacement

Procedure

Q5 Project – EMS ECU/ Component Replacement Procedure

Doc No: 2921 02 224 A1730

Date: 24 July 2017

Revision: 0.1

Page 11 of 26

Prepared: Shashank Addala / Prasad

M

Checked: Prasad M

Approved: Satishkumar P

This document contains confidential information which is exclusive property of TML. The contents of this

document shall not be reproduced, or conveyed, or given to third parties in any manner without the consent

of TML.

Step 4: Below Routine to be executed

“DPF 1 - Replacement of ECU and Old ECU is not communicating (Set EEPROM values for PFlt_CoRgn

Exchange of ECU) ($ 02 06)”

Routine Execution Detail:

Refer Section 4.3.1 in ‘TML_PT_Q5_Routine Procedures_EMS Requirement_2921 02 224

A1724_5June2017_V0.2’ document

Step 5: Below Routine to be executed

“TVA DC Motor Test”

Routine Execution Detail:

Refer Section 4.11 in ‘TML_PT_Q5_Routine Procedures_EMS Requirement_2921 02 224

A1724_5June2017_V0.2’ document

Step 6: Below Routine to be executed

“EGR high pressure DC Motor Test”

Routine Execution Detail:

Refer Section 4.7 in ‘TML_PT_Q5_Routine Procedures_EMS Requirement_2921 02 224

A1724_5June2017_V0.2’ document

Step 7: Below Routine to be executed

“DPF Service Regeneration”

Routine Execution Detail:

Refer Section 4.3.2.2 in ‘TML_PT_Q5_Routine Procedures_EMS Requirement_2921 02 224

A1724_5June2017_V0.2’ document

Step 8: Below Routine to be executed

“VGT DC Motor Test”

Routine Execution Detail:

Refer Section 4.12 in ‘TML_PT_Q5_Routine Procedures_EMS Requirement_2921 02 224

A1724_5June2017_V0.2’ document

Step 9: Below Routine to be executed

“VGT DC Motor Test”

Routine Execution Detail:

Refer Section 4.12 in ‘TML_PT_Q5_Routine Procedures_EMS Requirement_2921 02 224

A1724_5June2017_V0.2’ document