Background Image
Table of Contents Table of Contents
Previous Page  72 / 1526 Next Page
Information
Show Menu
Previous Page 72 / 1526 Next Page
Page Background

43

4 DLT ENGINE

l

Clean the area of header plate where the tank

sits thoroughly

l

Insert new tank packing in place without twisting

l

Clinch the header plate projections with monkey

plier.

l

After clinching confirm dimension of header

plate height as 10.2 to 10.6 mm.

l

Fix the member support & tighten the bolts

properly.

CAUTION : -

l

Tank packing shall be replaced every time, when

the tank is taken off for servicing.

l

If any of the clinching projections is broken

during the clinching or releasing process,

discontinue the servicing & replace the entire

radiator by a new one.

2.5 Servicing of Pipe Component, Drain cock

pressure cap

l

Replace the O rings of these component, clean

the component while reassemble

l

Replace the pressure cap with new one if

leakage is through even after cleaning the filler

neck

2.6 Confirmation of Proper Sealing

l

After the sealing work is over, assemble the

radiator properly.

l

Subject the assembled radiator to leakage test

as per

Sr.No

. 2.2

CAUTION :

If the problem of leakage persists, it is

advisable to replace the radiator with new one

3 Radiator Installation

l

Ensure that all the openings of the radiator are

closed properly except the inlet / outlet

l

Install the radiator on the vehicle ensuring

proper alignment, damping etc. as applicable

l

Connect the inlet and outlet pipes and clamp

them properly, Fit the fan shroud and etc.

l

Fill the radiator with proper quantity of FRESH

PREMIXED COOLANT as recommended.