Background Image
Table of Contents Table of Contents
Previous Page  313 / 1018 Next Page
Information
Show Menu
Previous Page 313 / 1018 Next Page
Page Background

3 CYL DIESEL ENGINE

99

5. Loosen and remove EMS plastic channel

assembly mounting screw.

6. Remove HP pipes connected between the

common rail and injectors.

7. Remove Back Leak Hose Assembly.

8. Loosen and remove fuel pressure line (Pump

to Rail)

9. Loosen and remove fuel rail mounting hex

flange screw.

10. Take out the assembly fuel rail.