AIR CONDITIONING

35

SAFETY PRECAUTIONS

EVACUATION -

CONNECT CHARGING

STATION

CONNECT GAUGE

MANIFOLD

START VACUUM

PUMP -HIGH

PRESSURE and LOW

PRESSURE GAUGE

READINGS

(HP BELOW ZERO)

(LP BELOW ZERO)

EVACUATE /

DEHYDRATE

TO -1 kg / cm2

CONTINUE FOR

15 MINUTES

STOP PUMP

OBSERVE THAT

PRESSURE DOES NOT

RISE ABOVE - 0.9 kg / cm2

WITHIN 15 MINUTES

IF PRESSURE STABILISES

AT HIGHER LEVEL

RE-EVACUATE

IF PRESSURE

CONTINUOUSLY

RISES-LEAK TEST

RE-EVACUATE

AFTER

RECTIFICATION.

CHARGING (R 134a 660 ± 20 grms)

OPEN HIGH SIDE VALVES and

ALLOW AS MUCH AS

REFRIGERANT AS POSSIBLE

TO ENTER SYSTEM, BUT

NOT MORE THAN 660 ± 20 gms

CLOSE VALVES and ROTATE

COMPRESSOR FRONT

PLATE MANUALLY TO

ENSURE NO LIQUID IS

TRAPPED IN THE

COMPRESSOR

START ENGINE SET TO FAST

IDLE. (1500 - 1700 rpm) ACTIVATE

A/C SWITCH. SET CONTROL TO

MAXIMISE COOLING and

HIGH BLOWER SPEED

OPEN LOW SIDE VALVE and

COMPLETE THE CHARGING

PROCESS (IF REQUIRED)

CAUTION: DO NOT ALLOW

MORE THAN 3.5 kg / cm2

TO REGISTER ON THE

LOW SIDE GAUGE DURING

CHARGING

CLOSE ALL VALVES and TAPS.

REMOVE HIGH and LOW

FILLING HOSES. CONNECT

HIGH SIDE FILLING HOSE

TO RECOVERY UNIT INLET

SIDE. SWITCH ON

RECOVERY MACHINE and

REMOVE ALL

REFRIGERANT IN FILLING

HOSES