INSTALLATION:
NOTE
nting
the relevant screws must be discarded too.
Verify that the electro valves, pressure sensor
and ground tab connections does not show
any visible anomalies in displacement or
damaging.
Verify the right cleanliness of the electro valve
mating side. No contamination from foreign
materials is acceptable (oil, dust, metal burrs,
etc.). If necessary, cleaning process must be
over
the electro valve block, still using for
reference the two threaded rods and moving it
parallel towards the mating surface. Insertion
of all the electro valves, pressure sensor and
ground tabs must be obtained by appropriate
load on
sink and following handling precautions.
is
positioned mated to the electro valve block,
remove the two threaded rods.
holes and tighten each screw by applying a
torque of 6.0 ± 1.2 Nm, following the order
shown in the image below. Please consider
that screw on pos. 1 is M5 x 55and screws on
pos. 2, 3 and 4 are M5 x 68.
Engage the two female connectors with the
cable on the
NOTE
If the TCU will be dismounted from EV Block it
is not allow to mount it again.
After TCU dismounting the relevant screws
must be discarded too
The surface of the electro valve block must be
ABSOLUTELY clean and free from oil or other
polluting substances
NEVER use improper tool (screwdrivers, etc)
to lift and extract the TCU from the electro
valve block
Any extraction tool (if any) that will be
developed must be submitted to MM approval
MM will not be responsible for malfunctions or
claims following operations not described in