ZEST AND BOLT - page 575

DRIVETRAIN-TA65 Star
47
4. Remove Synchropack assembly (3/4 speed)
CAREFULLY so that springs, carriers and
balls do not jump out.
Synchropack -Shifter sleeve, engaging gear,
synchrocone, spring, ball, carrier (sleeve in
case of 1st gear).
5.Pry out circlip from lay shaft.
6.Remove 3rd gear lay shaft.
7.Pry out circlip from lay shaft.
8. Remove 2nd gear from lay shaft.
9. Remove the double synchro pack that sits on
the second gear
9a. Remove the engaging gear pack (1/2 speed)
CAREFULLY so that springs, carriers and
balls do not jump out.
Fig. 44
1...,565,566,567,568,569,570,571,572,573,574 576,577,578,579,580,581,582,583,584,585,...
Powered by FlippingBook