Background Image
Table of Contents Table of Contents
Previous Page  880 / 1232 Next Page
Information
Show Menu
Previous Page 880 / 1232 Next Page
Page Background

BODY

39

2. Connect the wire harness connection on

WWM.

3. Tighten the earthing connections on

manipulator bracket LH and RH side.

4. Properly place the CCB & HVAC assembly

inside the BIW

5. Fix the CCB to BIW fixings.

8. Tighten the cowl link fixing.

9. Connect the drain tube and heater tube

connections.

10. Connect the door wire harness connections

on both sides.

11. Connect the wire harness connections on A

pillar.