Background Image
Table of Contents Table of Contents
Previous Page  1298 / 1863 Next Page
Information
Show Menu
Previous Page 1298 / 1863 Next Page
Page Background

STEERING

40

D. STEERING PUMP :

i. PRESSURE PORT CONNECTOR :

Dismantling:

1. Hold the pump in proper fixture.

2. Loosen and remove the pressure port

connector using a spanner.

3. Separate the connector, valve, spring and “O”

ring.

NOTE:

Use new “O” ring at the time of assembly.

INSPECTION:

1. Check for scoring marks and damages in the

“O” ring seating areas and damages in the

thread.

2. Check for damages and thread worn out.

NOTE:

Discard all rubber parts and sealing washer and

use new one at the time of assembly.