Background Image
Table of Contents Table of Contents
Previous Page  171 / 1018 Next Page
Information
Show Menu
Previous Page 171 / 1018 Next Page
Page Background

3 CYL PETROL ENGINE

137

4. Refit the Thermostat

5. Refit the Closed Coupled Catalytic Convertor

(CCC) and Gasket.

6. Follow the tightening sequence.

7. Reconnect the Lambda Sensor Upper and

Lower to CCC.

8. Refit the Heat Shield by tightening the three

bolts.

9. Refit the CCC left side support bracket near

Compressor.