PUNCH.EV SERVICE MANUAL

Unbolting mounting nuts First remove the mounting nut, by using ratchet • of 7mm Hex Then open 3 Socket/bolts using a ratchet of • 2.5mm Hex Disconnecting BMS Harness Remove connection from J2 &J6 • Then remove COM 9 to COM2 in the same • fashion. Now remove connection of v-sense harness • and BMS harness. They are present in front of each module. HIGH VOLTAGE ELECTRICAL SYSTEM (HV) 94

RkJQdWJsaXNoZXIy MTIwNTUz