PUNCH.EV SERVICE MANUAL

Performe IPX7 After closing the pack, it’s important to performe • the IPX7 test on the pack. GENERAL CHECK POINTS 1. After the replacements are done make sure to connect the wires as they were. 2. Check continuity across the replaced pack. 3. Mark the faulty ones and send them back to Pune office. K. REPLACMENT OF MODULE TO SLAVE HARNESS Disconnecting LV &HV connection Disconnect the HV and LV connection. • Disconnecting BMS Harness Disconnect the connection of BMS and LV • Harness. HIGH VOLTAGE ELECTRICAL SYSTEM (HV) 93