4. Reconnect brake lines. Be certain that the brake lines have been connected to the correct ports to ensure proper I - VBAC operation. Tighten the coupling nut to specified torque. 5. Connect the hose pipe TMC reservoir to I - VBAC Unit. 6. Connect the both suction hose of AC system & fill the gas. 7. Locate & mount the Battery tray. 8. Place the battery & assemble the battery strap. 9. Mount the Battery & connect the battery terminal. Bleed the brake system. 10. Clear all fault code memories. 11. 12. Road test vehicle to ensure proper operation of the base and I - VBAC systems. NOTE Software bleeding procedure to be follow if the I - VBAC remove / replace.s Clear all fault code memories. BRAKES_LR 46
RkJQdWJsaXNoZXIy MTIwNTUz