ARIA

ENGINE 82 14.Install piston rings in their respective position on piston using ring expander. 15.Stagger piston rings gaps such that they are 120°apart (with butt gap not in line with piston pin) CRANK SHAFT: Clean and carry out visual inspection of crank shaft for the following: 1. Overheating of journals, this is indicated by bluish brown colour 2. Scoring marks on journals 3. Cracks, which should be checked on magnetic crack detector 4. Check crank shaft run out by supporting it on Vblock at 1st and 5th main bearing journals. 5. If run out exceeds permissible limits, straighten crank shaft in cold condition on press carefully. 6. Similarly check lateral and radial run outs of flywheel mounting flange. 7. Check crank shaft main bearing and crank pin journal dimension. 8. Record the readings in the format given at the end of this group. 9. If necessary, grind crank shaft main bearing and crank pin journals to next under-size. 10.Maintain correct fillet radius for journals 11.Care must be taken during grinding to ensure that width of journals is not increased. 12.Should it be necessary to grind sides of 4th main bearing journal, grind it to next undersize. 13.Re-chamfer oil holes on journals to avoid scoring of new bearing shells. 14.Finish journals by lapping them with 320 grit lapping cloth of suitable width. 15.After grinding recheck main bearing and crank pin journal dimensions.

RkJQdWJsaXNoZXIy MTIwNTUz