HEXA

TOD 32 2. Press the ball bearing (1) using a drift (Part No. 287058902604) into the case and install the snap ring (2). 3. Install the new oil seal, by pressing it into the case. 4. Make sure that all parts are correctly and firmly installed into the case. 5. Position the output shaft (1) in transfer case and install the end yoke assembly (2), oil seal (3), washer (4) and nut (5). 6. Holding the end yoke with the help of yoke holder, tighten the nut. 7. Invert the case assembly on the fixture for further assembly. C. ASSEMBLY OF OUTPUT SHAFT AND GEROTOR PUMP 1. Place the collar on to the input shaft.

RkJQdWJsaXNoZXIy MTIwNTUz