NEXON BSVI MCE - SERVICE MANUAL
SUSPENSION 43 6. It is to be ensured that vehicle is kept loaded as per point no. 3 while performing activity no. 4 to no. 6. 7. Unladen the vehicle. NOTE:- This procedure should be followed for any of above mentioned fastener under consideration of working.
Made with FlippingBook
RkJQdWJsaXNoZXIy MTIwNTUz