TIGOR EV_ZIPTRON_SERVICE MANUAL
HV ELECTRICAL SYSTEM 79 STEP 7 Assemble support bracket on cradle. Hand tight 2 bolts. H/FL SCR M8X30 TS17130-10.9-SS8451S2- YH (2 Nos) Assemble compressor mtg. bracket and hand tight 4 bolts. Apply recommended torque. SCREW M10x1.25x50 TS17130 10.9SS8451S2-YH (4 Nos) STEP 8 Apply recommended torque to the 7 bolts for STEP – 1 . STEP 9 Apply recommended torque to the 2 bolts, STEP – 7. D. A, B, & C MOUNT FITMENT SEQUENCE STEP 1 First place A & B mount brackets on BIW. SCR M10X1.25X30 TS17070 10.9SS8451S2-YH, - 4 Nos. Do torqueing as recommendation. "HEX FL BOLT M10X1.25X40 TS17130- 10.9 – 2 Nos. Do torqueing as recommendation. Before assembly, ensure centralization of powertrain. Mounts should not be pre stressed in any direction. Torqueing sequence for Mount to BIW. TIGHTENING TORQUE = 5.5-6.0 Kg-m.