TIGOR EV_ZIPTRON_SERVICE MANUAL

HV ELECTRICAL SYSTEM 78 STEP 4  Then mount OBC assy first then DC-DC assy on cradle & hand tight bolts. Apply recommended torque.  H/FL SCR M8X30 TS17130-10.9-SS8451S2- YH (6 Nos) STEP 5  Mount PDU mounting assy on cradle. Tighten the bolts with specified torque.  HEX.FL.SCR. M8X45 TS17130 8.8 SS8451-8C (3 Nos)  Locate PDU assy on cradle and hand tight all bolt. Tighten the bolts with specified torque.  HEX FL SCREW M8X20 TS17130-8.8- SS8451-8C (3 Nos)  H/FL BOLT M8X45 TS17130-8.8-SS8451S2-Y (1 Nos) STEP 6  Assemble the ventilation hose and suction pipe compressor end then after tighten the bolts with recommended torque.  H/FL SCR M6x16 TS17130-8.8-SS8457S1- BL-B (2 Nos)

RkJQdWJsaXNoZXIy MTIwNTUz