ZEST BOLT Service Manual
AIR CONDITIONING 18 11.6.2 REMOVAL OF WIRING HARNESS CONNECTORS FROM CONTROL PANEL 1. For removing the connector press the snap and pull the connector outside. 2. For removing the connector 2 press the snap and push the lever. 11.6.3 SERVICING OF BLOWER ASSEMBLY 1. Remove wiring harness connector. 2. Remove motor cooling pipe. 3. Unscrew the blower assembly mounting screws. 3 Nos. 4. Remove the assembly.
Made with FlippingBook
RkJQdWJsaXNoZXIy MTIwNTUz