SAFARI STORME MY14

PROPELLER SHAFT 16 ASSEMBLY OF UNIVERSAL JOINT 1. Position the cross in the yoke. 2. Move one end of the cross to cause a trunnion to project through the cross hole beyond the outer machined face of the yoke lug. Place a bearing assembly over the trunnion diameter and align it to the cross hole. Using an arbor press, hold the trunnion in alignment with the cross hole and place a solid plug on the upper bearing assembly. 3. Press the bearing assembly into the cross hole enough to install a snap ring. 4. Install a snap ring. 5. Repeat the above steps to install the opposite bearing assembly. 6. If the joint is stiff, strike the yoke ears with a soft hammer to seat the needle bearings. !CAUTION Be sure that snap rings are properly seated in grooves. 7. Repeat the above steps at the opposite end of the propeller shaft in installing a second kit. If removed earlier, the unitized seal should be replaced with a new unit. Install a new seal by

RkJQdWJsaXNoZXIy MTIwNTUz