SAFARI STORME MY14
GEAR BOX 37 7. Insert the needle cage bearing. Slide the 1st speed gear along with engaging gear on the needle bearing such that the engaging gear is upward. 8. Select suitable snap ring (1) and fit it over the main shaft (Snap ring are available in the thick- ness ranging from 1.7mm to 2.2mm in step of 0.05mm) and place the needle cage bearing (2) 9. Slide the 2 nd gear sub-assembly over main shaft along with synchro cone such that synchro cone facing downwards. 10. Locate 3 mm Dia. locking ball at seat on main shaft with help of grease. Slide spacer, aligning notch with the locking ball. Ensure that oil pocket over the spacer is facing upwards i.e. towards 3 rd gear. NOTE The spacer has to be heated to 100°C to 120°C be- fore assembly.
Made with FlippingBook
RkJQdWJsaXNoZXIy MTIwNTUz