35
AIRCONDITIONING
CHARGING THE A/C SYSTEM:
1. Installation of Manifold Gauge
a Close both the high and low hand valves of the
manifold gauge.
b Connect the low pressure hose to the low pressure
charging valve and the high pressure hose to the
high pressure charging valve.Tighten the hose nuts
by hand.
Important
Do not apply compressor oil to the seats of the
connection.
2. Evacuate Air in Refrigeration System
a. Connect the center hose of the gauge set to the
vacuum pump inlet.
b. Open both the high and low hand valves and run
the vacuum pump.
If opening the low pressure hand valve pulls the
high pressure gauge into the vacuum range, there
is no blockage in the system.
c. After about ten minutes, check that the low
pressure gauge indicates more than 600 mmHg
(23.62 in Hg, 80.0 kPa) of vacuum.
If the reading is not more than 600 mmHg (23.62
in Hg, 80.0 kPa), close both valves and stop the
vacuum pump. Check the system for leaks and
repair as necessary.
If no leaks are found, continue evacuating the air
in the system.
d. Continue evacuating the air in the system until the
low pressure gauge indicates a vacuum of 750
mmHg (29.53 in Hg, 99.98 kPa).
e. Close both the high and low hand valves and stop
the vacuum pump, then leave the system in this
condition for five minutes or longer and check that
there is no change in the gauge indication.
CLOSED
OPEN
AIR
OPEN
CLOSED
Fig. 49
Fig. 50