PUNCH.EV SERVICE MANUAL

Assembling the pack cover After connections, put the top cover of the • battery pack for fixing a torque of 7-8 N.M is used. The ratchet will move in clockwise direction. Performe IPX7 After closing the pack, it’s important to performe • the IPX7 test on the pack. E. REPLACMENT OF FUSE Removing insulating cap First unbolt the bolt coming from Pyro switch to • disconnect the busbar. Also remove the insulation cap on the Pyro switch side. Disaasemble the bus bar Unboult the bolts on the top for disconnecting • the +ve Busbar. Using a Socket of 10mm Hex in Anti-clockwise direction. Disaasemble the Fuse connection Disconnect the connection of Fuse coming from • BMS harness. HIGH VOLTAGE ELECTRICAL SYSTEM (HV) 84