PUNCH.EV SERVICE MANUAL

STEP 1 - Insert the 4 screws along with washers first. STEP 2 - Insert the 3 screws along with washers as shown. STEP 1 - Tighten the all screws with tightening torque 2.3 Kg-m. D. REPLACMENT OF CONTACTORS Disassembling the bolts on the bus bar Unboult the boults on the top for disconnected • the busbar connection coming from HV connector. Using a ratchet of 10mm, Move the ratchet in Anti-clockwise direction. Disassembling the wiring LV harness connections After opening the boults, Disconnect the LV • wire harness connection on positive contactor for B+ + & B+ - HIGH VOLTAGE ELECTRICAL SYSTEM (HV) 82