PUNCH.EV SERVICE MANUAL

8. Remove the mounting screw of heat exchanger of bracket. FITMENT Follow reverse procedure for assembly. Tighten the following fasteners to the recommended torque. i) Compressor mounting. ii) Refrigerant lines on compressor. Service and Maintenance • Coolant drain and refill Conduct activity when BCS pump is off • Remove cap of auxiliary tank • Remove one connection from battery inlet / • outlet joint and drain the coolant. Refilling of coolant Close all joints • Fill coolant from auxiliary tank • Follow de-aeration process. • HV / LV CHARGER PORT & CABLE I. REMOVAL REMOVAL 1.Refer Instructions for working on HV Components mention before starting work. 2. Refer Instructions of HV connector Lock removal process before starting work. 3. Pull the cable and open Charger flap. 4. Disconnect the electrical connector. 5. Loosen the fasteners and remove the charging port. HIGH VOLTAGE ELECTRICAL SYSTEM (HV) 106

RkJQdWJsaXNoZXIy MTIwNTUz