Removing the Cable tie Now remove the cable tie. • Removing the LV Connector Once the clamp is removed Pull out the LV • harness connector. Now remove the LV connector by removing the • U clamp. Removing the BMS board Now Un nut the nuts of the base of BMS board • carefully, and lift the board assembly. Removing J2&J6 connection Now Disconnect the J6 and J2 connection on • the BMS. First always remove the J6 and then J2 Removing Com connection Now remove the connection from COM 9 to • COM 2. In the same series. HIGH VOLTAGE ELECTRICAL SYSTEM (HV) 96
RkJQdWJsaXNoZXIy MTIwNTUz