NEW NEXON SERVICE MANUAL

7. Fit the hose connecting turbocharger to EVRV. 8. Locate the CCC to the turbocharger outlet then mount the upper mounting bolts of the CCC. 9. Tighten the lower mounting bolts of the CCC. Install side heat shield mounting bolt. 10. Install rear heat shield mounting bolts. 11. Install the heat shield and tighten the heat 12. shield lower mounting bolts. Petrol Engine Ph-2 (CAFÉ)_DCT 161

RkJQdWJsaXNoZXIy MTIwNTUz