NEW NEXON SERVICE MANUAL

X. ASSEMBLY OF INTAKE MANIFOLD 1. Install the intake manifold as per specified torque sequence. 2. Install the bottom support bracket to the intake manifold. 3. Fit the fuel injectors on the fuel rail. 4. Tighten the mounting bolts of the injector retainer on the fuel rail. 5. Install the fuel rail along with the injectors. 6. Install the temperature pressure sensor on the intake manifold. Petrol Engine Ph-2 (CAFÉ) 163

RkJQdWJsaXNoZXIy MTIwNTUz