4. Tighten the fasteners as per given sequence. 5. Assemble the lower ITG Bearing Cap with locating dowels. Ensure the NRV (Non return valve) in place inside lower ITG. 6. Place the camshafts to their respective location in such way that the cam lobes of first cylinder are opposite to each other as shown. 7. Guide pin for VCT. NOTE Insert the tool in bearing cap holes one by one and tighten the fasteners to ensure the proper alignment of bearing cap. 1.2L REVOTRON CNG PHASE-2 ENGINE 186
RkJQdWJsaXNoZXIy MTIwNTUz