NEXON EV MAX SERVICE MANUAL

HV ELECTRICAL SYSTEM 74 Fitment Follow reverse procedure for HV battery assembly considering following points.  Align battery pack using hydraulic trolley/scissor lift with vehicle from bottom side.  Lift the Battery pack to match the vehicle underbody cavity and mounting holes of pack are coincided to the BIW bush holes.  Fasteners M10X40 along with spring and plain washers are to be pre-assembled at all 14 locations and hand tight all.  Once all the bolts are hand tightened and fitment is ensured, pack is ready to be mechanically torqued.  Tightening torque of 4.9 kgfm is applied on all 14 fasteners.

RkJQdWJsaXNoZXIy MTIwNTUz