NORMAL / AC CHARGING A. AC Charging Architecture Precautions for Normal Charging Proper maintenance of earthling pit is must. 1. Add water & add salts at regular intervals into the earth pits in order to maintain the value of earth resistance. Check annually the condition of the electrodes so as to add or replace electrodes. The electrical socket used for EV charging and 2. its associated wiring should be able to supply 15A dedicated load continuously. Check the charging inlet for accumulation of 3. dust or any foreign objects. Don’t try to pull off the charging gun during 4. charging. Don’t pull out the charging gun if it is in locked 5. condition as excess force can break or damage the locking mechanism. Charging instructions Vehicle must be parked with park brake in 1. engaged state before connecting the charging gun. Vehicle charging port must be free of dust, 2. water or snow while connecting the charging gun; if not proper cleaning method must be used to remove dust, water and ice. If the charging gun is removed, reinsertion 3. should be done after at least 10 seconds of removal of the charging gun. Gun unlocking feature on EV Gun unlocking for AC charging is done through fascia switch. After AC slow charging, AC power supply to be switched off. Fascia switch on dashboard panel to be pressed to unlock the AC slow charging gun. HIGH VOLTAGE ELECTRICAL SYSTEM (HV) 30
RkJQdWJsaXNoZXIy MTIwNTUz