1.2L REVOTRON Bi FUEL CNG ENGINE 192 41. Assemble both the sides Ventilation Hose Clamp on HP Line at cylinder valve after leak test found OK with tightening torque 0.3 Kg-m and orientation of hose clamp to be maintain as accessibility. CAUTION Do not try to screw / unscrew the valve by holding the manual ON /OFF knob. After complete installation of the cylinder valve, check all the connections of cylinder valve and then slowly open the manual ON/OFF knob of the valve until it is fully open. NOTE Never try to remove the cylinder valve on vehicle. Removal of cylinder valve from cylinder shall done by TATA Motors Ltd authorized dealers or government authorized cylinder recertification agencies only. Get the CNG Cylinder checked and recertified after every 3 years or as per the latest CVMR rules at Govt approved test agencies mentioned in this Manual Never fill CNG cylinder with air, LPG or any fuel except CNG. Keep the vehicle away from any Fire source. Remove the CNG tank during the welding / brazing work on the Car.
RkJQdWJsaXNoZXIy MTIwNTUz