HEXA

TRANSMISSION 47 45. For gear shift lever fitted on shift shaft (Transmission shaft) by using M10 nut and across flat arrangement on shaft and tighten the nut with hand. NOTE: Make sure gear shifter lever assembly in park mode by rotating lever in front direction. 46. Insert the anchoring bracket and the fixture plate (Part No: 2870 5890 26 21) with the help of Hexagonal M8 screw along with Anti rotation screw for fixture during tightening. 47. Properly align and intact the gear shifter cable in anchoring bracket slot. 48. Insert the gear shifter cable end – (Trans end) in the pivot pin hole. 49. Refit the shifter cable transmission ends to the tightening torque 2.2 to 2.5 kgfm without damaging the shifter cable rubber parts. 50. Tightened the Hexagonal M12 thin nut to torque 4.0 to 4.5kgfm. WARNING: Do not bend the shift cable when opening the shift linkage adjustment nut. 51. Then remove the M8 screw for removal of fixture plate and then give the tightening torque 2.0 to 2.5kgfm M8 nut.

RkJQdWJsaXNoZXIy MTIwNTUz