NANO

TRANSAXLE (NANO AMT) 110 8. Apply thread lock gum to the thirteen M8 bolts fastening the front half to rear half and tighten them to a torque of 2.1 ~ 2.5 Kgm. 9. Tighten the reverse idler M8 bolt with sealing washer to a torque of 2.3 kg m. 10. Lift the Shifter dogs accessible through the top cover using a screw driver to get the input and lay shaft ball bearing grooves protrude out. 11. Fit the snap ring onto the deep groove bearings. 12. Place the oil collector in the rear cover, such that the groove in the rear cover aligns with the groove in the oil collector. Make sure that the fit is not loose. 13. Push the bush to input shaft and place needle roller bearing 5th gear input shaft, 5th gear lay shaft. 14. Assembly 5th and reverse synchro pack assembly with shifter fork and dowel pins of respective shafts.

RkJQdWJsaXNoZXIy MTIwNTUz