NANO

FUEL SYSTEM 18 REMOVAL & REFITMENT OF SOV COIL REMOVAL  Unscrew the coil External nut using 22 mm spanner.  Remove the upper O – ring (1) and internal nut (2) using 17 mm socket.  Remove the SOV coil (1) and lower O-ring (2)  Remove the SOV coil (1) and lower O-ring (2) RE-FITMENT  Replace the new coil and tighten the SOV lower nut in request position to 12 + 1 Nm. (Using 17 mm socket & torque wrench.)  Place the upper O-ring and tighten the SOV nut to 8 + 1Nm. 2 1 2 2 1

RkJQdWJsaXNoZXIy MTIwNTUz