NEXON EV SERVICE MANUAL

HV ELECTRICAL SYSTEM 8 DO’S DON’TS  Each EV components enclosures shall be connected to chassis with cable.  Do not keep the earthing point in loose condition; apply the torque as per the drawing.  HV battery pack power connector and service disconnect shall be connected at the lasr, when all safety checks are done.  Never work on high voltage system when it is in active state  Use the insulated tools for the assembly.  Do not use the non-insulated tools for the assembly.

RkJQdWJsaXNoZXIy MTIwNTUz