ZEST BOLT Service Manual
ENGINE 1.3 QUADRAJET (75PS) 28 53.Loosen the band, Remove the bolts (1a) and remove the coolant supply pipe to the engine oil heat exchanger (1b). 54.Loosen the band and disconnect the E.G.R. pipe (1) from the thermostat. 55.Remove the bolts (1a) and remove the cylinder head assembly (1b). 56.Remove the cylinder head gasket (2).
Made with FlippingBook
RkJQdWJsaXNoZXIy MTIwNTUz